Quality Control & Containment

Keep production running. Deliver with confidence

header quality control

What We Deliver

QS1

Supplier Containment – CSL1 / CSL2, Incoming Goods Inspection / Firewall

QS2

Visual Sorting & Dimensional Inspection (On-site, At the customer facility or at Our Warehouse)

QS3

Final Product Inspection

Secure your customer

QS4

Resident Engineering. Process and product audits

On-site quality representation to manage incidents, coordinate 8D/APQP actions, and ensure real-time communication.

QS5

Disassembly & Assembly Services

Safe teardown and reassembly to recover value from suspect assemblies.

QS6

Leaktest Services

Precision leak and bubble testing for automotive and Industrial Components

scope

Scope

– Locations: Your plant, your customer’s site, or our warehouse (Romania). EU deployments available.
– Stages: Incoming, in-process, end-of-line, pre-shipment, and customer containment.
– Parts: Metal and plastic components, machined and casted parts, sub-assemblies, electronic housings, etc.
– Flow: From temporary containment to stabilized release with certified documentation.

response time

Response Time & Coverage

– Mobilization: Same-day or next-day start in Romania (depending on scope and location).
– Coverage: Nationwide in Romania; cross-border projects within the EU on request.
– Availability: Multi-shift and weekend coverage; emergency hotline by agreement.

standards conformity

Standards & Compliance

– IATF 16949 certified for automotive work.
– CSL1/CSL2 execution per OEM & Tier 1–2 requirements.
– Sampling per ISO 2859-1 (AQL) or customer-specific plans.
– Documentation support: VDA 6.x, PPAP / FAI, 5S, and traceability.
– ESD handling and special packaging available.
– Calibrated gages and recorded MSA where applicable.

typical use cases

Typical Use Cases

– Supplier spill or field return containment.
– SOP and ramp-up launch protection.
– GP-12 Early Production Containment.
– Engineering or tooling change verification.
– Incoming inspection to protect your production line.
– Rapid sorting during deviations or incidents.
– Pre-delivery inspection to reduce claims and logistics cost.
– International inbound gateway: inspection of goods from Asia before EU distribution.

Capabilities Equipment

Capabilities & Equipment

– Scalable teams with certified leads, inspectors, and rework technicians.
– Controlled work areas: quarantine, sorting, rework, and accepted-parts zones.
– Equipment: calipers, micrometers, height gauges, plug/pin gauges, torque tools, light tables, magnifiers, CMM, and roughness measuring systems.
– Reporting: Pareto charts, defect photos, lot/shift/operator traceability, COQ metrics, daily & final reports.
– Logistics add-ons: repackaging, labeling, kitting, and VMI integration.

how we work

How We Work

– Define: Scope, criteria, locations, quantities, sampling plan, and SLA.
– Mobilize: Teams, work instructions, checklists, calibrated tools.
– Execute: Segregation, inspection, rework, certified release.
– Report: Daily dashboards, NCR / 8D inputs, shipment certificates.
– Close & Prevent: Confirm stability, adjust controls, and document lessons learned.

Industries We Serve

Industries We Serve

– Automotive OEMs and Tier suppliers
– Aerospace manufacturers and component suppliers
– Industrial equipment & machinery manufacturers
– Importers and distributors (Romania, EU, Asia)
– Contract manufacturers and logistics providers

For International Suppliers scaled

For International Suppliers

If you ship into Romania or the EU, we can receive, inspect, rework, and dispatch only conforming material to your customers — reducing returns, lead time, and cost.

Rapid Mobilization Requirements 1

Rapid Mobilization Requirements

– Approved scope (defect types, AQL/sampling plan)
– Drawings and handling instructions (ESD, labeling, cleanliness)
– Site access or delivery confirmation
– Purchase Order or emergency authorization
Note: Response times and SLAs confirmed in your quote. 24/7 and weekend coverage available.

Mission Values

Typical Response Times

– Romania (on-site): Same day (4–8 h) for light visual sorting; next-day for larger teams.
– Warehouse: 2–6 h after part receipt and approval.
– EU deployments: 24–72 h depending on travel & scope.
– Ramp-up: Small team within hours, full multi-shift within 24–48 h.
– Rework setup: +6–24 h for special jigs, fixtures, or approvals.
– Dimensional checks: Immediate with gauges; +12–24 h if CMM programming is required.

Request a Quote

contact globalcode